The prestigious
The total cost of the project is estimated to be Rs. 700 cr covering total length of 27.70 km. The original cost of the project was around 550 cr, which was later increased to Rs. 200 due to change in scope of work.
The expressway will have 8 & 6 lanes covering 22.33 km and 5.37 kms respectively. It will have total of 11 flyovers and underpasses.
The Expressway from Delh would start from Rao Tula Ram Marg via Palam, Mahipalpur, kapashera, Udyog Vihar, Kendriya Viha, IFFCO Chowk,
The Expressway will have total of 32 lane toll collection points. There will total of 3 toll collection points on the expressway. It is estimated that around 150000 vehicles would be using the expressway.
Commuters traveling to and from
The service roads measuring 46.80 kms will cater to local traffic without interfering with long distance through traffic while providing access to local business establishments.
No comments:
Post a Comment